Point Should be know every Civil Site Engineer. Civil Tips
by
Tutorial Tips Civil
·
03/10/2019
Point Should be known by every Civil Site Engineer.
There are some general points to remember for every site engineer to make easier work at the site.
- Lapping is not allowed for the 36 mm diameter bars or more.
- Maximum spacing for a chair per 1 No per 1m2.
- Chairs minimum of 12 mm dia bars to be used.
- For dowels rod minimum of 12 mm diameter should be used.
- The minimum bars for the square column is 4 Numbers and 6 Numbers for the circular column.
- Main or distribution bars in the slabs shall not be less than 8 mm.
- The minimum thickness of the slab is 125 mm.
- Dimension tolerance for cubes is +- 2 mm.
- Free fall of concrete is allowed at a maximum of 1m height.
- Lap slices not be used for bars larger than 36 mm.
- Water absorption of clay bricks should not be more than 15 %.
- The PH value of the water should not be less than 6 for concreting.
- The compressive strength of clay Bricks is 3.5 N / mm2.
- For steel reinforcement binding wire required is 8 kg per MT.
- The density of Clay bricks is 1600 – 1920 kg/m3
- The concrete block’s density is 1920 kg/m3.
- Reinforcement concrete Density is 2350 kg/m3.
Curing Time For Different Types of Cement.
- Curing Required for super sulphate cement is a minimum of 7 Days
- Ordinary Portland Cement (OPC) curing is a Minimum of 10 Days.
- For Minerals & Admixture, Added Cement curing is 14 Days.
Minimum De-Shuttering time of the different types of RCC members.
- Column, Wall, Vertical Member De-shuttering time is 24 Hours.
- Formwork for soffit slab minimum time is 5-7 days and props are to be fixed after removing Plates or bottom shutting.
- Slab beam Shuttering can be removed after 7 days or props to be fixed after removing Plates or bottom shutting.
- Beam De-shuttering time for spanning Less than 4.5m 7 Days.
- Beam De-shuttering time for spanning more than 4.5m 14 Days.
- Arches Beam De-shuttering time is 14 Days for 6m in length.
- Arches Beam De-shuttering time is 21 Days for more than 6m lengths.
Visit our Channel for more information.
Tutorials Tips