Top 10 point observed while receiving any Civil Drawings.

Point to be observed while checking of drawings

Layout drawings (Project)

  • Name plate as per specified form.
  • Project name drawing title, subtitle and scale.
  • North direction.
  • Boundaries as per the latest site demarcation (Theodolite survey) given to the architect bu site engineers.
  • Existing tree locations.
  • Existing well, bore-well, electric pole, telephone pole, over head exiting telephone and electrical lines, over head high tension line, huntsmen and all other structures marked on the theodolite survey drawing.
  • Building set backs, other building structure obstructing the existing structure, sufficient set back for septic tank etc.
  • Road, septic tank, U.G.W.T., bore well, Pump house garden, transformer room, society office location, size, details etc.
  • Check the sizes of septic tank and U.G.W.T. in construction with the plumbing consultant.
  • R.L.’s of road top, flat plinth, parking, garden top, L.T. room plinth society office, top of U.G.W.T, main entrance road, T.B.M. location etc.

RESPONSIBILITIES OF THE SUPERVISOR, JUNIOR ENGINEER, QUALITY ENGINEER AND SENIOR ENGINEER

cement bags store concrete mixing water cement ratio Cement quality testfibre concrete

For more info related to civil engineer please visit our YouTube  Channel.

 

Thanks

You may also like...

Leave a Reply

Your email address will not be published. Required fields are marked *