TOP TO DOWN CONSTRUCTION METHOD

WHAT IS TOP TO DOWN CONSTRUCTION?

We have various method for built a building, This method is very advance and unique to construct a building simultaneously both direction up or down this method called top to down construction..

INTRODUCTION

• Conventionally, buildings with underground basement are built by Bottom-up method
• But it is not feasible for the gigantic projects with limited construction time and/or with space and other site constraints.
• The Top-Down construction method enables the superstructure and the underground structure to be built simultaneously.
• This technique can reduce construction time significantly.

METHODOLOGY

• Installation of Diaphragm wall.
• Installation Wall Barrette Piles.
• Excavation of Soil just below Ground slab.
• Provide Structural strut to support diaphragm wall
• Exposed Coupler bars/Dowel bars from Diaphragm.
• R.C.C. slab to be cast with suitable size opening for further construction.
• After Casting slab, excavation to continued through opening.
• Excavation to be continued till lowest basement slab level.

  1. Installation of Diaphragm wall

  1. Excavation & Installation of Steel Strut

  1. Construction of Underground Structure

  1. Next level of Construction of Underground Structure

  1. Construction of side walls & Remove the Strut

  1. Backfilling & Reinstatement

a. EXECUTION OF DIAPHRAGM WALLS

b. CONSTRUCTION OF PILES WITH PLUNGE COLUMNS

c. CONSTRUCTION OF SLAB

d. TOP-DOWN CONSTRUCTION

e. TOP-DOWN CONSTRUCTION

There are some advantages and disadvantages of this method

ADVANTAGES

• The shortened construction period due to simultaneous construction.
• More operational space gained from advanced construction of floor slabs.
• It is highly suitable for construction for tall buildings with deep basements to be constructed in urban areas.
• These can be installed in close proximity to existing structure with minimal loss of support to existing foundations.

DISADVANTAGES

• Higher cost.
• The lateral displacement of retaining wall or ground settlement may possible.
• The construction quality may influence.
• It requires highly skilled supervision and labor force.

Civil engineer apps load bearing structure Load Bearing Wall or Partition Wall IS code for civil engineer CIRCULAR WATER TANK

You may also like...

1 Response

  1. WOW! Who knew there were that many different ways to construct a building! Great info!

Leave a Reply

Your email address will not be published. Required fields are marked *